The GRP pool head is mounted on the raw concrete pavement and usually projects out from the finished pool gallery about 25 cm. At the pool outside, the floor sealing can be connected to the pool head body. For the floor, a pavement with the desired incline is laid out in the pool, and then laminated sealed. Afterwards, the pool floor can of course also be laid with mosaic tiles. The floor drain, as well as the clear water inflows are laid out in the floor area, we will deliver special built-in parts. The water measure connection is integrated into the pool head element. Water depths can vary from 5 to 40 cm.
Planning element:
Elements with overflow channel
Elements without overflow channel
|
![]() ![]() ![]() ![]() |